WNHS – Programme 2017-2018

WELWYN NATURAL HISTORY SOCIETY (WNHS)

Programme 2017 – 2018

2017

Meetings held at Welwyn Civic Centre, Small Hall 8 p.m. – 10 p.m.

Feb 22            Here Come the Hares!                                      Jane Russ

Mar 22            Medicines from Living Things                           Dr Chris Woolston

April 26           The Biodiversity at Panshanger Park               Jen Gilbert

May 24           The History of the Amwell Magna Fishery        Feargal Sharkey

June 21           Reptiles and Amphibians at the Commons     Rory Dimond

Sept 27           Up, Up and Away, the Story of Bird Flight       Dr Edward Eastwood

Oct 25             The Natural Wonders of Bolivia                       Clint Bull

Nov 22            Joint meeting with Hertfordshire Natural History Society

                       (Speaker and Subject to be announced)

Dec 13            Light Hearted Quiz & Members Christmas Gathering

2018  

Jan 24             AGM and Members evening

                        Members’ photos, exhibits and short talks welcomed.

                        (Offers to Raymond Uffen in advance please)

Feb 28             Protecting our Hen Harriers                              Paul Stancliffe

MONTHLY OUTDOOR MEETINGS

3rd Sunday    Friends of Mardley Heath work parties

                           – Meet at car park 10 am

4th Sunday    Tewinbury SSSI work parties September – April

                            – meet at HMWT car park on Farm Drive 9.30 am

                            (Contact Robin Cole 01438 813403

3rd Thursday  Danesbury Local Nature Reserve – work parties

                            Meet at 10 a.m.  –  call John Roper on 07910 311589 for details of the                             meeting place)

HERTFORDSHIRE NATURAL HISTORY SOCIETY (HNHS)

Nov 22 2017      Joint Meeting with WNHS at Welwyn Civic Centre (See above)

HERTS & MIDDLESEX WILDLIFE TRUST  (HMWT) – Local Group

(Contact Penny Fanthorpe 077617 12245)

Feb 28         Conservation Overseas                    Steve Hughes A Rocha

                          Meeting at Howlands Baptists Church WGC – 8 pm

Mar 11         Willow Weaving Workshop               Hazel Godfrey

                          Meeting at Howlands Baptist Church, WGC – 10 a.m. to 1 p.m.

Mar 28        Round the County in 90 hours – Walking the Herfordshire Way –                                              – an illustrated talk                      Elizabeth Hamilton

                          Meeting at Howlands Baptist Church, WGC – 8 p.m.

The Draft Local Plan Proposed for Submission – Infrastructure Delivery Plan

Introduction

This is the third and final article on the Draft Local Plan; previous articles have presented The Facts, and The Fall Out.

As with the earlier articles, the following comments are the result of the work of the Welwyn Planning sub-group, formed by the Welwyn Parish Council for the express purpose of analysing the Draft Local Plan, and including elected representatives of the Welwyn Parish Council Planning Committee. the Welwyn Parish Plan Action Group, and the Welwyn Planning & Amenity Group.

General Comment

It is self evident that Housing Developments should not be undertaken without regard to the impact on the local infrastructure, of schools, traffic and health, but it is commonly felt in the community that this is exactly what planners and developers do.

There is a concern that whereas the needs of an upcoming development might be assessed, there is also a need to take into account the impact of very recently completed, or part completed developments.

In regard to Schools, provision has to be made by law for childrens’ education and, unlike increases in traffic, cannot be ignored.

For this reason when discussing the need for primary school provision in the Civic Parish of Welwyn, the Planning sub-group has taken into account the recently completed 100 houses on the Frythe development (Wilshere Park) in order to judge or make an assessment of needs.

Other infrastructural issues relate to funding, and specifically the application of section 106 Agreements and CIL (Community Infrastructure Levy) which Welwyn Hatfield has yet to introduce. The pond is cloudy at the very time when clarity is needed.

When the Borough introduces CIL there will be statutory rules regarding restrictions on the number of financial contributions obtained through planning obligations which can be ‘pooled’ to fund particular infrastructure. The effect of this is that planning obligations under section 106 will remain in use alongside a CIL charge, but for a more restricted set of purposes.

For this reason, the Infrastructure Plan should explain the consequences, advantages or disadvantages of waiting until late 2017 or 2018 before the CIL is introduced.

Matters specific to Welwyn Parish

Housing Numbers

The infrastructure comments below are based upon the following estimates of housing numbers in and around Welwyn Parish obtained from the relevant plans.

Welwyn, recently completed (see comment above)     100

Welwyn: Approved but not yet built.                             150

Welwyn : In the Plan                                                     100

Woolmer Green: Plan                                                   150

Codicote: NH Plan                                                        315

From what we know from Local Plans we can expect 450 of the houses recently completed or planned for this part of Welwyn Hatfield to be occupied in the first 5 years of the Plan and approximately half of those planned for Codicote in the same period.

Education

The demand within the parish will be for primary school places and this demand, according to HCC calculations, equates to IFE, ie 30 children, which agrees with the WHBC estimate (Para 6.59) and capacity throughout the primary school years ultimately of 210..

The primaries at Woolmer Green and Oaklands have neither the capacity nor the space to expand. We understand, (although no details have been provided) that the same applies to St John’s Digswell.

St Mary’s could expand to be a 3FE school and, given its Outstanding rating from Ofsted this would be attractive to residents. It is appreciated that this would require the loss of contiguous playing fields but this is permissible (Paras 6.24/25). There is a statement that St Mary’s is a listed building. This is not correct.

The alternative, a new school, which would have to be a Free School/academy, would require land of its own on which to be established.

Codicote is in the Borough of North Hertfordshire but its 1FE primary (recently reduced from 2FE?) is short of places. Development in Codicote will put further pressure on the local school and some consequent spill over to Welwyn Parish  (Para 6.59). unless that school is expanded. Some influx from Knebworth might also be expected (Para 6.59).

Traffic

Para 5.104: There is a traffic mitigation plan for the 4 roundabout complex associated with the A1(M) junction 6. In addition to southbound traffic  from the motorway itself the feeder roads from the north,  B197 from Knebworth and Woolmer Green and B656 from Hitchin and Codicote will, by 2022 be carrying significantly more traffic into Welwyn Hatfield via Welwyn.

With the intended timescale of development (see above) the traffic mitigation scheme is scheduled for the period 2023-2027.

This is too late!

The Traffic Mitigation Plan  is a small scheme, costing approximately £0.5M. and the Borough should urge the Highways Agency to bring this small scheme forward by several years to minimise the traffic problems that these developments will make, rather than attempting unsatisfactory patch-up solutions later.

Health

The Bridge Cottage Practice in Welwyn has a patient list of just over 16000. Its catchment area extends beyond Codicote to Kimpton, where there is a satellite surgery by appointment only.

The algorithm used to calculate GP needs (para 7.30) suggests that 8.5 full time GPs will be needed to service the expanded list (17000). It is not clear to us what the current staffing level is but this figure should be the target.

Conclusions

We will hope to be able to fill in the gaps as we move forwards.

 

 

The Draft Local Plan Proposed for Submission – the Fall Out

WPAG – Local Plan – Analysis and conclusions

This is the second of three WPAG articles which present a summary of the analysis undertaken by a Welwyn Planning sub-group, whose membership included the WPAG. The first dealt with ‘The Facts‘, and this one deals with ‘the Fall Out‘. A third article will cover our analysis of the Borough’s Infrastructure Plan, when we have reached our conclusions.

The Welwyn Planning & Amenity Group has contributed to a joint response submitted to the Council today, 21st October 2016, and we acknowledge the quality of research and analysis from within that Group, and particularly the contribution of Ian Skidmore, of the Parish Plan Action Group.

The Facts – a reminder,

The first WPAG article posted on 6th October dealt with ‘The Facts‘ and addressed fundamental issues about:

  • the purpose and objectives of the Local Plan;
  • Borough Council targets which aim to meet projected housing and employment needs up to 2032;
  • the approach followed by the Council
  • how to go about registering and responding
  • the need to focus on the legality (of compliance) and soundness of the Council’s approach.

The Fall Out (for Welwyn)

This WPAG article now deals with the Impact of the Local Plan on the Civic Parish of Welwyn. It will separately address the settlements of Oaklands/Mardley Heath, Welwyn, and Digswell.

Legal Compliance – our conclusion

It is the WPAG view that the Local Plan, in this draft form, is legally compliant. The borough has:

  • followed the Local Development Scheme,
  • followed the Local Development Scheme,
  • prepared the Plan in accordance with the Statement of Community Involvement,
  • followed regulatory requirements for consultation
  • complied with their duty to cooperate
  • complied with the Sustainability Appraisal.

Soundness – our conclusion

All the evidence is that the Local Plan:

  • has been produced in a positive manner;
  • justifies decisions
  • makes decisions that are evidence based
  • is effective, in the sense that it can be delivered
  • is compliant with the National Planning Policy Framework (NPPF).

So – what is there to shout about for Welwyn?

Housing developments?

Infrastructure?

As a member of the Planning sub-group, we have examined, and re-examined, all the development sites proposed for Welwyn, including those now being put forward for approval, and also all those which have been rejected by the Council.

We have examined each site in turn, and to each we have applied our test for legality and soundness so that we can be confident in our conclusions. For a detailed description of these sites, go to the Borough Council Consultation Portal.

Sites for Housing Development  (The Infrastructure Delivery Plan will be addressed separately).

The Housing Sites Selection process is encapsulated in a background paper which brings together key conclusions arising from the following strands of evidence and appraisals:

  • The Housing and |Employment Land Availability Assessment (HELAA)
  • The Green Belt Study Review (Parts 1 & 2)
  • An appraisal of Green Belt boundaries
  • The Sustainability Appraisal
  • Flood Risk
  • Sequential test, and
  • An appraisal of strategic advantages or disadvantages.

To study these papers in detail go to the Housing Sites Selection – Background Paper

Local Plan Section 17 – Oaklands & Mardley Heath

We consider the draft Local Plan to be legally compliant.

WHY?

Several sites have been proposed for development, of which some have been rejected and others are in the Local Plan. We believe the process employed in making these decisions was sound, with the single exception of GTLAA04.HS32 which is discussed below.

Sites Rejected by the Borough Council:

OMH6: (Danesbury Park Road) As originally proposed this site included both a LNR and a designated wildlife site.. When these were discounted the site was not contiguous with a settlement excluded from the greenbelt and so was deemed contrary to NPPF development in the grreenbelt at Stage 1 of the assessment (HELAA 2016, Appx, D)

OMH7 Land at 22 The Avenue, passed Phase 2 of the HLAA but was subsequently rejected because of difficulties establishing a defendable Green Belt Boundary once the current boundary, the A1(M) was breached. (Housing Site Selection Background Paper 13.10 and Appx.D June 2016. This is consistent with the NPPF.

Sites accepted by the Borough Council:

OMH5, HS 17: (2a to 12 Great North Road), OMH8  HS 16: (2 Great North Road) were both reviewed  positively during the various phases of the HELAA  (HELAA 2016) and are proposed to be taken forward.

GTLAA04. HS32.The Four Oaks Gypsy/Traveller site has currently 5 permitted pitches and is in the Green Belt. The Plan allows for 6 further pitches, a total of 11, and exclusion from the green belt..  We do not consider this to be sound. This site is a private not a public site and so cannot contribute to the identified need for public sites in the borough and, from this standpoint, fails to be either positively prepared or justified. The planning history of the site is complex but in summary a six-Authority review in 2007 concluded that this site was not suitable to accommodate further pitches. Following this the borough has until now consistently maintained that the site is only suitable for 5 pitches, i.e. 10 caravans and their associated support buildings. Changing the Green Belt boundaries to exclude this site is feasible and the new boundary would be defendable but this does not in any way alter the capacity of the site.  The Inspector should also be aware that, in parallel with this plan there is a planning application (N6/2016/0211/S73B), currently on hold, that seeks permission for up to 20 caravans of which no more than 5 should be static or mobile homes.

Local Plan Section 18 – Welwyn SADM 28

We consider the draft Local Plan to be legally compliant.

WHY?

Welwyn is the historic centre of Welwyn Civic Parish  It is excluded from the Green Belt. Several sites have been proposed for development, some have been rejected and three have been included in the Local Plan. It is our view that the processes involved in making these decisions were sound. See below.

Sites Rejected by the Borough Council.

Wel1 (Land at Kimpton Road) The borough rejected this site and the adjacent Wel2 ( Land to the East of Welwyn Cemetary) and Wel15 (Land to the south of Linces Farm) sites for several reasons although they passed the HELAA Phases. They should be considered together (Housing Site Selection-Background Paper Appendix E). Most importantly the expansion of the green belt boundary would lead to ribbon development between Welwyn and Codicote, and one of the prime purposes of the green belt is to prevent such coalescence (NPPF para 80). There are serious issues with access, requiring a new bridge and widening of a rural road with effects on a designated wildlife site (WS5 and an LNR and there is  potential for flooding . The site topography is open and housing on this site would dominate the landscape

Site Wel5, the “school reserve site” was rejected at HELAA Phase 1 as it was impossible to achieve access. HELAA 2016, appendix D).

Sites Wel6,(Kimpton Road Gravel Pit)  Wel8 (Land at Rollswood Road) Wel10 (Whitehill),Wel12 (Northof Reynards Road),Wel13 Field opposite 40 Reynards Road) were all rejected at HELAA Phase 1 as they were not in or contiguous with an established settlement  (HELAA 2016, appendix D) and thus were contrary to NPPF (para 80).

Wel14. Because of access issues this site would only be viable in conjunction with  Wel 1 and Wel 2 and the reasons for rejecting it mirror those for the other two sites  (HELAA 2016, Appendix G).

Wel16 (Whitehill).  Access to this site is via a village road that is mainly single width with poor pedestrian provision and with a pinch point that cannot be modified. (see Highways comment in HELAA 2016, appendix G).  Emergency access via single track roads would be problematic. The connection with the existing settlement is tenuous.

Sites Accepted by the Borough Council:

Wel3; HS 20 Previously developed land, (Affinity Water Site). Three houses have already been built on this site and the plan is for 7 more, a total of 10. Assessment suggests there are no unmanageable constraints to developing this site. (HELAA2016, appendix E)

Wel4 HS 19. (Sandyhurst)  This partially developed site would extend the green belt boundary  to the A1(M) junction 6 exit slip road which is a good permanent boundary. The borough resisted extending the site further to the southwest to maintain a significant and defendable gap between Welwyn and Welwyn Garden City. (HELAA2016, appendix E). Excellent public transport connectivity.

Wel11 HS18. (The Vineyards) This site, part previously developed land, would have moderate to strong green belt boundaries. There would be some loss of openness. Good access to public transport. (HELAA2016, appendix E). Traffic sitelines will need to be managed.

Local Plan Section 19 – Digswell

We consider the draft Local Plan to be legally compliant and to be sound.

Why:

Digswell is one of three distinct settlements that comprise Welwyn Civic Parish. It is excluded from the Green Belt. It was the subject of a Character Appraisal in 2004 that was adopted as a SPD by the borough. Several sites in Digswell have been considered for development.  None has been taken forward. It appears to us that the process employed was sound

Dig 1, (Hillside land behind 2 New Road), was rejected in the Phase 1 HELAA (HELAA2016 appendix D) with concerns over visual  openness  and drainage and water run-off leading to flooding. This is in accordance with NPPF.

Dig 2 (Adjacent to 81 Hertford Road) and Dig 3 (Land North of Harmer Green Lane)were rejected at HELAA Phase 1 as they are not contiguous with a settlement excluded from the Green Belt and so were contrary to NPPF on green belt development. Dig4 was rejected at Phase 2 for similar reasons (HELAA 2016, appendix C).

Dig 5, (land adjacent to 76 Hertford Road) was rejected at HELAA Phase 1 as it is not contiguous with the settlement and the majority is within a registered historic park and garden (HELAA 2016, appendix D). Part of the site is in a flood zone 3a.

Conclusion

The Report of the Welwyn Planning sub-group was submitted to the Welwyn Hatfield Borough Council on Friday 21st October 2016

 

Draft Local Plan Proposed Submission – the Facts

What is the Draft Local Plan Proposed Submission?

The Local Plan and its supporting documents were published on 30th August 2016 in order for responses (‘representations’) to be made prior to its submission to an independent Inspector for examination in the Spring of 2017.

Once submitted by the Council, it will be the task of the Inspector to decide if it can be adopted. This means that any responses made from now on will be forwarded to the Inspector. For this reason, responses have to be made in a certain way, and they must address the purposes of examination set out in the Planning & Compulsory Purchase Act 2004, which are:

  1. Does the Plan comply with the legal requirements?
  2. Is the Plan a sound plan for the future of Welwyn Hatfield?

Legal Compliance

This concerns the process of preparing the Plan:

Soundness

This concerns the actual content of  the Local Plan.

  • Has it been Positively prepared?
  • Is it justified?
  • Will it be effective?
  • Is it consistent with National policy?

General Advice when responding;

There is a lot of material guidance within the Guidance Note for Respondents,guidance-for-respondendentsand it is recommended that you read this before responding on the soundness of the Local Plan.

Responses must be made through the Council’s online portal, or by emailing or by post. Forms are available on the Council website, and are also available at the Welwyn Parish Council Offices, in Lockleys Drive. (Monday, Wednesday and Fridays from 9 a.m. to 1 p.m.)

We are reminded that the consultation is not a ‘vote’, and the Inspector will give the same weight to an issue whether it appears in hundreds of responses or only in one. Residents Associations, and representative groups are encouraged to make a single response, which should nevertheless indicate how many the group represents, and how the response has been authorised.

All responses must be received by 5 p.m. on 24th October 2016.

So – What does the Draft Local Plan Proposed for Submission contain?

The Local Plan sets out a blue print for future growth of Welwyn Hatfield, and contains a planning strategy for the borough, identifying sites where development will happen over the next 15 years, and policies to guide decisions on plannng applications.

Public Consultation started on Tuesday 30th August and closes at 5 p.m. on Monday 24th October.

The Local Plan contains:

  • a vision for the future of the borough
  • growth targets for housing, employment and retail development
  • strategic policies
  • development management policies
  • site allocations
  • Policies Maps.

Summary & Guide

A good place to start to get a grasp of the scope of the Local Plan is to study the Summary & Guide . Go online and get your own online copy.

Housing Targets

In the Summary & Guide you will learn that the Housing Target to meet the demands of the borough’s future generations is 12,000 new homes, and that the Council asserts that 6,500 homes can be delivered without developing on Green Belt land.

But because 79% of our Borough is Green Belt Land, the amount of this which is required for new development in the Local Plan is less than 4%.

Employment

The Local Plan will provide space to create 16,900 new jobs in the plan period, helping build a strong local economy.

Objectives of the Local Plan

The Summary & Guide presents Objectives of the Plan, including:

  • delivery of a sustainable pattern of developments by directing most new development to the towns and limited development to the villages.
  • working with service providers to deliver mixed and sustainable communities
  • to support and reinforce the role of the borough’s villages and neighbourhoods and create new sustainable neighbourhoods
  • to provide an adequate supply and mix of housing
  • to protect, maintain and where possible, enhance the historic and natural environment
  • to enhance opportunities for, and access to, recreation, heritage, cultural activities and improve green links
  • to sustain the viability of our villages and rural economy
  • to maintain and enhance the vitality and viability of our town, neighbourhood and village centres.

How Much Growth?

Welwyn Hatfield needs more housing and jobs to enable the next generation to afford their own homes, access varied employment opportunities and enjoy healthy vibrant communities.

The population is growing, migration levels have been high in recent years, more people live on their own, and are living longer, creating a high demand for property.

Policy SP2 sets Targets for Growth, and how best to distribute growth around the borough. The towns and villages are tightly constrained by the green belt and there is insufficient capacity in the towns and villages to meet the future demand for growth.

To meet the need for 6,200 new dwellings, the Council considers that exceptional circumstances justify removing land from the green belt in sustainable locations around the edges of the borough’s towns and some villages. Land is also proposed to be removed from the green belt at Symondshyde north-west of Hatfield to create a new village.

Policy SP3 deals with Settlement Strategy and Green Belt Boundaries, and proposes that Welwyn Garden City and Hatfield are the primary focus for development, and that the excluded villages are a secondary focus, compatible with a more limited range of job opportunities, shops, services and other facilities available within them.

Distribution of housing growth:  Welwyn      Digswell     Oaklands & Mardley Heath

Completions 2013-16                     133               3                 9

Capacity within urban areas           153             12               16

Capacity from Green belt areas       67              0                31

Total capacity 2013-2032               353             15                56

Village Sites

New Homes at Welwyn – Policy SADM29

The Vineyards HS18 (Wel11)                                      residential      30

Sandyhurst HS19 (Wel4)                                             residential      30

School Lane HS20 (Wel3)                                            residential      7

New Homes at Oaklands & Mardley Heath – Policy SADM28

2 Gt North Rd HS16 (OMH8)                                        residential     5

Four Oaks, Gt North Rd HS32 (GTLAA04) Gypsy and Travellers Site – pitch extension                                                                                            6

Land to rear of 2-12 Gt North Rd HS17 (OMH5)          residential   20

Other Policies

Other Policies outlined in the Summary are as follows:

  • Policy SP8   The Local Economy
  • Policy SP9   Place Making & High Quality Design
  • Policy SP10  Sustainable Design and construction
  • Policy SP11  Protection and enhancement of critical environmental assets
  • Policy SP12  Strategic Green Infrastructure
  • Policy SP13  Infrastructure Delivery
  • Policy SP14  New Schools
  • Policy SP25 Rural Areas
  • Policy SP26  Neighbourhood Planning

Other Documents available online are:

  • Sustainability Appraisal – you can comment on the assessment.
  • Habitats Regulations Assessment – you can comment on the assessment.
  • Draft Infrastructure Delivery Plan – which identifies infrastructure requirements which arise to meet the identified need for housing and employment and retail, including community facilities, education, roads and sewerage. You can comment on the contents of the Draft Infrastructure Delivery Plan.

How you can get involved.

The best way to comment on the draft Local Plan Proposed Submission is online, but there are Forms which can be completed and returned by post.

It is important to know that before you can enter an online comment, you must first ‘Register’, because it is a two-stage process – so do not leave your comment to the last minute as you might get caught out.

 

 

Defibrillator – News about Training – and an update.

Welwyn’s Community Defibrillator

AED Barclays WelwynWelwyn Village now has an AED (Automatic External Defibrillator) located outside Barclays Bank in Church Street.  This is accessible 24/7 without prior training by anyone witnessing a person having a suspected heart attack.  It will significantly increase the chance of saving their life before Paramedics arrive.

If you are in this situation:

  • Call 999
  • Go to the AED cabinet outside Barclays
  • The Ambulance Operator will give you the code to open the cabinet door so you can retrieve the AED and at the same time they will despatch medical help
  • Take it to the patient and follow the easy video and audio instructions on the AED unit
  • You cannot harm someone in error; if they are not actually in cardiac arrest (heart attack) the AED will not shock them!

Many thanks to everyone who supported the fund-raising initiative.  In particular we thank the Welwyn Wailers for donating £1,000 from this year’s Wail, and the four village businesses that responded with donations, Mimram Veterinary Centre, Neel Dentistry, Putterills and SuSu.

Training

We have arranged for the Community Heartbeat Trust to run an awareness session at 8 – 9.30 pm on Wednesday 28th September in St Mary’s Church House.  This is for anyone who would like to know how to recognise someone having a heart attack, how the AED works, how it links with the ambulance service and how to look after the patient until medical help arrives.  This session is free of charge and you are very welcome to attend.

We almost have funds for a second AED and pending further fund-raising are investigating other locations within the civic parish of Welwyn.  If you are able to contribute to this important community asset please contact us for details.

Jane Carr                                                         Ian Skidmore

                            

01438 712510                                                 01438 716428

 

 

 

Bike and Hike Today

It might be a bit wet outside today, and a little late to remind you, but not too late to ask you to consider donating to a good cause.

Today, Saturday 10th September 2016, is the Annual Bike and Hike Event organised by St Mary’s Church, Welwyn.undefined

This year the money raised is split half and half between ‘Bliss‘, a charity that helps babies and their families who are born unwell or prematurely, and the Historic Churches Trust, who help maintain the historic church buildings across Herts. and Beds.

It might a little late to invite you to hike or bike today, but not too late for you to make a donation. To make a donation online to: https://www.justgiving.com/fundraising/welwynbh2016

 

 

 

Draft Local Plan – Consultation Events and Documentation

Documentation

The Draft Local Plan and Policies Map; the Sustainability Appraisal, the Habitats Regulations Assessment Report and the Draft Infrastructure Delivery Plan, together with a summary guide to the Draft Local Plan and guidance notes for making a representation, the Statement of Consultation and the Statement of Representations Procedure can be viewed at http://www.welhat.gov.uk/localplan

Added to which, paper copies of the Draft Local Plan, the Policies Map and other documents will also be available to view at a number of inspections points throughout the local area. (See below)

Consultation Events

The Welwyn Hatfield Borough Council are holding a series of six Consultation Events across the Borough, where you will be able to speak directly to Council Planning Officers, on a one-to-one basis, and obtain paper copies of the documentation.

Details of all Events are included in the Local Plan Newsletter No.11 but for your convenience, the Consultation Event closest to Welwyn will be held on Wednesday 14th September 2016 at the Welwyn Civic Centre, Prospect Place, from 3.30 p.m. to 7.30 p.m.

You are all encouraged to go along, and ask questions.

The WPAG and the Welwyn Parish Council Planning & Licensing Committee are actively putting responses together, so please let us have your views.

 

Local Plan Newsletter – Issue 11

The Borough Council has commenced the period of public consultation for the Final Draft of the Local Plan. This started on Tuesday 30th August and ends on Monday 24th October at 5 p.m.

The Welwyn Hatfield Borough Council (WHBC) have produced Newsletter No. 11 which contains details of the dates and venues of their drop-in consultation events, and you are encouraged to note these dates and to attend, in order to get a fuller understanding of the Local Plan.

This consultation process is your final opportunity to make representations before the Local Plan is submitted for independent examination by the Government’s appointed Planning inspector.

But it is important to read the advice given in Newsletter No.11 regarding the basis upon which representations may be made, and to be clear that these representations will be made public. It is the Planning Inspector, and not the WHBC Planning Department who will consider representations at this stage.

For your own personal copy of Newsletter 11, which details the WHBC approach and schedules click Local Plan Newsletter 11 August consultation special

 

 

 

 

 

Sherrardspark Wood Warden Society – 50th Anniversary Year 2016

Who we are.

Sherrardspark Wood sits within the green belt that separates Welwyn Garden City and Welwyn village, to the West.

Sherrardspark Wood Wardens’ Society is an independent voluntary group helping to care for the woods in accordance with the management plan of Welwyn Hatfield Borough Council (WHBC), which has been agreed with Natural England and the Forestry Commission with a view to keeping this Site of Special Scientific Interest in favourable condition.

Volunteer Work Parties – Home and Away

Work parties take place on both Thursday and SSPWWW Group Six Ways Dec 2010 web_1unday and more than 20 members regularly attend. The Society puts much time and effort into the work it undertakes not only in Sherrardspark Wood but also when helping volunteers at other sites in the district.

A group of Wood Wardens regulary attends the work parties organised on the third Thursday each month by the Friends of Danesbury Local Nature Reserve in Welwyn, where they are currently much involved in the work on the Danesbury Park Fernery Restoration Project. The Wood Wardens also provide regular support to the Friends of Mardley Heath who meet on the third Sunday every month..

Celebrations

The year 2006 saw the Wood Wardens 40th year anniversary. This was celebrated with an excellent picnic in Sherrardspark Wood and a Wood Wardens’ commemorative bench was erected at Six Ways, a meeting of 6 paths within the wood.

The wood wardens enjoy the social camaraderie that has been generated within its membership, and in 2011 a Wood Wardens’ Walking Group was formed which offers a monthly walk rounded off by a pub lunch.

2016 will be the Wood Wardens 50th anniversary and a busy Programme has been arranged.

Calendar of Events

The 2016 Programme can be found on the WPAG Events Calendar. But for full details of the Wood Wardens Society and all their many activities, go to the Sherrardspark Wood Wardens website.

 

The Clock Roundabout – Traffic Light Survey

The Danesbury Residents Association (DRA) has been at the forefront trying to resolve concerns about traffic congestion issues, and specifically grid-locking which was predicted would, and has arisen, as a result of two main events:

  1. The A1(M) EXIT 6 (N) slip road changes which encouraqes traffic to make a rat-run from the A1(M) Exit slip road, along the Welwyn  By-pass and back on to the 20160222_160825Motorway at the A1(M) entry slip by the Clock,
  2. The opening of the new Clock Gardens development of 50 apartments with the potential for residents’ cars to access and egress directly onto the roundabout at rush hour in the morning and evenings

The DRA have been actively pressing for a single traffic light to be installed on the south side of the roundabout, to break up the traffic flow, which would discourage the A1(M) rat-runners and allow local traffic access to the roundabout from all directions. (For the background story – see The Clock – the seconds are ticking away)

In their quest for ‘ANSWERS’ and ”ACTION’ County Councillor Richard Smith has been actively supporting the DRA. But, until recently, the DRA has been advised that there was no way that Highways England would consider placing traffic lights at the Clock. But, it seems that things might be changing!

Recently we have noticed that County Highways have been installing temporary ANPR cameras at various points on the A1(M) Exit 6 entry and exit points, and also attached to posts on all sides of the Clock Roundabout. The use of ANPR cameras enables a subsequent analysis to match rat-running vehicles as they enter and leave the system – and thereby produce the evidence we all seek.

So, what is actually happening?

County Councillor Richard Smith has come to our rescue once again, and he extracted the following note from somebody who, by the length of his Job Title, must surely know what is going on – and judging by his response to  Richard Smith – he does!

The following extract is from a helpful email dated 6th July 2016 from County Highways Group Manager Sanjay Patel. to County Cllr. Richard Smith, and relates to ‘a Survey being carried out ‘next week’... Unfortunately we have been unable to include the ‘attached plan‘ referred to, but the explanations are nevertheless very helpful.

Re: Traffic lights/ANPR Camera Survey by J6 A1

The attached plan indicates the locations of the where the surveys will be carried out and this will provide the following information that we will use for the signals design:

*       2 day Manual classified turning counts at all 3 junctions (the Clock, A1m SB off slip / A100 junction and the A1m NB off slip / B197 junction) as shown in yellow on the attached plan.
*       2 day Queue lengths at all 3 junctions
*       2 day ANPR surveys at the locations shown as open red circles on the attached plan
*       7 day ATC or video based MCC counts at the ANPR locations.

Sanjay Patel
Group Manager – Highways Operations & Strategies Intelligent Transport Systems & Development Management & Standards
Hertfordshire County Council

 

We have all seen the orange boxes and the temporary cameras and other equipment at all sides of the roundabout, and observant residents have noticed that a visual survey of traffic entering and leaving Clock Gardens and the roundabout, has indeed started. So we know that, at last, somebody has listened to us all, and at last it appears that something is happening.

But, don’t hold your breath, this is only a Survey. As soon as we hear of further actions, we will try to keep you informed.